Asunim Completes 40.3MW Solar Plant in Turkey

Publié le 26 déc. 2017
Asunim 
The system consists in two separate sites totalling 40.3MW, built in parallel, one of 19,7MW and another of 20.6MW, both located in Manisa, Turkey.

Asunim connected recently 40,3MW SPP to the grid and add this reference to its EPC and Operation and Maintenance portfolio.

Managing partner of Asunim Turkey, Mr. Umut Gürbüz stated: "Installing a project on a flat terrain is easier when compared to sites with different slopes. In order to get the highest yield several different studies and calculations were made for this challenging project."

The systems feature Jinko Solar high-efficiency (PID free) solar modules and REFUsol 40K string inverters operating without the need for fan cooling and with full IP65 protection against humidity and dust. The German company, Solar-Log was the choice for the SCADA system. Operation and Maintenance activities will be covered by Maxima Energy, affiliate but independent O&M Company of Asunim.


Profil ENF des Entreprises Mentionnées dans l’Article

Asunim (Installateurs): https://fr.enfsolar.com/asunim
Asunim (Vendeurs): https://fr.enfsolar.com/asunim
Les nouvelles de l'industrie photovoltaïque sont republiées gratuitement, veuillez envoyer vos news à