Scatec Solar Commissioned 22MW PV Power Plant in Jordan

Publié le 5 sept. 2016
Scatec 
Scatec Solar's third solar plant in Jordan has now reached commercial operation (COD) increasing the total production capacity in Jordan to 43MW.

Built under the Jordanian Renewable Energy Program, the 22MW solar plant is developed by Scatec Solar and European Jordanian Renewable Energy (EJRE). Scatec Solar owns 50.1% of the project company, while EJRE holds 49.9%.

The plant is built on an area of approximately 51 hectares, which is equivalent to about 95 football fields. Situated about 225km south of the capital city Amman, the plant will produce electricity in excess of 52,000MWh annually. The plant is connected to a substation built and controlled by the state utility, NEPCO, with whom Scatec Solar has signed a 20-year Power Purchase Agreement (PPA).

The clean energy produced by the solar plant will avoid 33,000 tons of CO2 emissions per year and serve the electricity need of about 10,000 households annually.


Profil ENF des Entreprises Mentionnées dans l’Article

Scatec (Installateurs): https://fr.enfsolar.com/scatec
Les nouvelles de l'industrie photovoltaïque sont republiées gratuitement, veuillez envoyer vos news à